Book Chapters

Chakrabortty R; Sarker R; Essam D, 2018, 'A Comparative Study of Different Integer Linear Programming Approaches for Resource-Constrained Project Scheduling Problems', in , Springer, Cham, pp. 227 - 242, http://dx.doi.org/10.1007/978-3-319-55914-8_17

Chakrabortty RK; Sarker ; Essam , 2017, 'Resource Constrained Multi-project Scheduling: A Priority Rule Based Evolutionary Local Search Approach', in Intelligent and Evolutionary Systems, edn. Proceedings in Adaptation, Learning and Optimization, vol 8., Springer, Canberra, Australia, pp. 75 - 86, http://dx.doi.org/10.1007/978-3-319-49049-6_6

Sallam K; Elsayed S; Sarker R; Essam D, 2016, 'Differential evolution with landscape-based operator selection for solving numerical optimization problems', in Intelligent and Evolutionary Systems The 20th Asia Pacific Symposium, IES 2016, Canberra, Australia, November 2016, Proceedings, pp. 371 - 387, https://link.springer.com/content/pdf/10.1007%2F978-3-319-49049-6.pdf

Bui LT; Essam D; Abbass HA, 2010, 'The Role of Explicit Niching and Communication Messages in Distributed Evolutionary Multi-objective Optimization', in DeVega FF; CantuPaz E (ed.), Parallel and Distributed Computational Intelligence, edn. Studies in Computational Intelligence, Springer, pp. 181 - 206, http://dx.doi.org/10.1007/978-3-642-10675-0

Hasan SM; Sarker R; Essam D; Cornforth DJ, 2009, 'A Genetic Algorithm with Priority Rules for Solving Job-Shop Scheduling Problems', in Chiong R; Dhakal S (ed.), Natural Intelligence for Scheduling, Planning and Packing Problems, edn. Studies in Computational Intelligence, Springer, Berlin / Heidelberg, pp. 55 - 88, http://dx.doi.org/10.1007/978-3-642-04039-9_3

Abbass HA; Essam D, 2006, 'Chapter I: All Hazards Analysis: A Complexity Perspective', in Abbass H; Essam D (ed.), Applications of Information Systems to Homeland Security and Defense, edn. Original, Idea Group Publishing, Hershey PA, USA: London, UK, pp. 1 - 16

Essam D; Abbass HA, 2005, 'All hazards analysis: A complexity perspective', in Applications of Information Systems to Homeland Security and Defense, pp. 1 - 16, http://dx.doi.org/10.4018/978-1-59140-640-2.ch001

Bui LT; Abbass HA; Essam D, 2005, 'Cooperative Coevolution of Genotype-Phenotype Mappings to Solve Epistatic Optimization Problems', in Abbass HA; Bossmaier T; Wiles J (ed.), Recent Advances in Artificial Life - Advances in Natural Computation - Vol. 3, edn. Original, World Scientific Publishing, Singapore, pp. 29 - 42, http://dx.doi.org/10.1142/9789812701497_0003

Mckay RI; Essam D; Nguyen XH, 2004, 'Finding Trigonometric Identities with Tree Adjunct Grammar Guided Genetic Programming', in Abraham A; Jain LC; van Der Zwaag BJ (ed.), Innovations in Intelligent Systems, edn. Original, Springer-Verlag, Heidelberg, pp. 221 - 234

Edited Books

abbass ; essam , (ed.), 2006, Applications of Information Systems to Homeland Security And Defense, Igi Global, http://dx.doi.org/10.4018/978-1-59140-640-2

Journal articles

Ahrari A; Elsayed S; Sarker R; Essam D; Coello Coello CA, 2021, 'Weighted pointwise prediction method for dynamic multiobjective optimization', Information Sciences, vol. 546, pp. 349 - 367, http://dx.doi.org/10.1016/j.ins.2020.08.015

Ali IM; Essam D; Kasmarik K, 2021, 'Novel binary differential evolution algorithm for knapsack problems', Information Sciences, vol. 542, pp. 177 - 194, http://dx.doi.org/10.1016/j.ins.2020.07.013

Zaman F; Elsayed S; Sarker R; Essam D; Coello Coello CA, 2021, 'An evolutionary approach for resource constrained project scheduling with uncertain changes', Computers and Operations Research, vol. 125, http://dx.doi.org/10.1016/j.cor.2020.105104

Sallam KM; Elsayed SM; Sarker RA; Essam DL, 2020, 'Landscape-assisted multi-operator differential evolution for solving constrained optimization problems', Expert Systems with Applications, vol. 162, http://dx.doi.org/10.1016/j.eswa.2019.113033

Haque M; Paul SK; Sarker R; Essam D, 2020, 'Managing decentralized supply chain using bilevel with Nash game approach', Journal of Cleaner Production, vol. 266, http://dx.doi.org/10.1016/j.jclepro.2020.121865

Zaman F; Elsayed S; Sarker R; Essam D, 2020, 'Hybrid evolutionary algorithm for large-scale project scheduling problems', Computers and Industrial Engineering, vol. 146, http://dx.doi.org/10.1016/j.cie.2020.106567

Elsayed S; Sarker R; Essam D; Coello Coello CA, 2020, 'Evolutionary approach for large-Scale mine scheduling', Information Sciences, vol. 523, pp. 77 - 90, http://dx.doi.org/10.1016/j.ins.2020.02.074

Samavati M; Essam D; Nehring M; Sarker R, 2020, 'Production planning and scheduling in mining scenarios under IPCC mining systems', Computers and Operations Research, vol. 115, http://dx.doi.org/10.1016/j.cor.2019.05.019

Mehmood K; Essam D; Shafi K; Malik MK, 2020, 'An unsupervised lexical normalization for Roman Hindi and Urdu sentiment analysis', Information Processing and Management, http://dx.doi.org/10.1016/j.ipm.2020.102368

Zaman F; Elsayed SM; Saker R; Essam D, 2020, 'Resource Constrained Project Scheduling with Dynamic Disruption Recovery', IEEE Access, vol. 8, pp. 144866 - 144879, http://dx.doi.org/10.1109/ACCESS.2020.3014940

Hamza N; Sarker R; Essam D, 2020, 'Sensitivity-Based Change Detection for Dynamic Constrained Optimization', IEEE Access, vol. 8, pp. 103900 - 103912, http://dx.doi.org/10.1109/ACCESS.2020.2999161

Mehmood K; Essam D; Shafi K; Malik MK, 2019, 'Sentiment analysis for a resource poor language-Roman Urdu', ACM Transactions on Asian and Low-Resource Language Information Processing, vol. 19, http://dx.doi.org/10.1145/3329709

Akl AM; Sarker RA; Essam DL, 2019, 'Adaptive simulation budget allocation in Simulation assisted Differential Evolution algorithm', Applied Soft Computing Journal, vol. 83, http://dx.doi.org/10.1016/j.asoc.2019.105678

Paul SK; Sarker R; Essam D; Lee PTW, 2019, 'A mathematical modelling approach for managing sudden disturbances in a three-tier manufacturing supply chain', Annals of Operations Research, vol. 280, pp. 299 - 335, http://dx.doi.org/10.1007/s10479-019-03251-w

Ali IM; Essam D; Kasmarik K, 2019, 'A novel differential evolution mapping technique for generic combinatorial optimization problems', Applied Soft Computing Journal, vol. 80, pp. 297 - 309, http://dx.doi.org/10.1016/j.asoc.2019.04.017

Zaman F; Elsayed S; Sarker R; Essam D; Coello CAC, 2019, 'Multi-Method based algorithm for multi-objective problems under uncertainty', Information Sciences, vol. 481, pp. 81 - 109, http://dx.doi.org/10.1016/j.ins.2018.12.072

Mehmood K; Essam D; Shafi K; Malik MK, 2019, 'Discriminative Feature Spamming Technique for Roman Urdu Sentiment Analysis', IEEE Access, vol. 7, pp. 47991 - 48002, http://dx.doi.org/10.1109/ACCESS.2019.2908420

Ali I; Essam D; Kasmarik K, 2019, 'A Novel Design of Differential Evolution for Solving Discrete Traveling Salesman Problems', Swarm and Evolutionary Computation

Samavati M; Essam D; Nehring M; Sarker R, 2018, 'A new methodology for the open-pit mine production scheduling problem', Omega (United Kingdom), vol. 81, pp. 169 - 182, http://dx.doi.org/10.1016/j.omega.2017.10.008

Paul SK; Sarker R; Essam D, 2018, 'A reactive mitigation approach for managing supply disruption in a three-tier supply chain', Journal of Intelligent Manufacturing, vol. 29, pp. 1581 - 1597, http://dx.doi.org/10.1007/s10845-016-1200-7

Rahman HF; Sarker R; Essam D, 2018, 'Multiple-order permutation flow shop scheduling under process interruptions', International Journal of Advanced Manufacturing Technology, vol. 97, pp. 2781 - 2808, http://dx.doi.org/10.1007/s00170-018-2146-z

Chakrabortty RK; Sarker RA; Essam DL, 2018, 'Single mode resource constrained project scheduling with unreliable resources', Operational Research, pp. 1 - 35, http://dx.doi.org/10.1007/s12351-018-0380-7

Sallam KM; Elsayed SM; Sarker RA; Essam DL, 2017, 'Landscape-based adaptive operator selection mechanism for differential evolution', Information Sciences, vol. 418-419, pp. 383 - 404, http://dx.doi.org/10.1016/j.ins.2017.08.028

Samavati M; Essam D; Nehring M; Sarker R, 2017, 'A methodology for the large-scale multi-period precedence-constrained knapsack problem: an application in the mining industry', International Journal of Production Economics, vol. 193, pp. 12 - 20, http://dx.doi.org/10.1016/j.ijpe.2017.06.025

Sallam KM; Sarker RA; Essam DL, 2017, 'Reduced search space mechanism for solving constrained optimization problems', Engineering Applications of Artificial Intelligence, vol. 65, pp. 147 - 158, http://dx.doi.org/10.1016/j.engappai.2017.07.018

Chakrabortty RK; Sarker RA; Essam DL, 2017, 'Resource constrained project scheduling with uncertain activity durations', Computers and Industrial Engineering, vol. 112, pp. 537 - 550, http://dx.doi.org/10.1016/j.cie.2016.12.040

AbdAllah AMFM; Essam DL; Sarker RA, 2017, 'On solving periodic re-optimization dynamic vehicle routing problems', Applied Soft Computing Journal, vol. 55, pp. 1 - 12, http://dx.doi.org/10.1016/j.asoc.2017.01.047

Paul SK; Sarker R; Essam D, 2017, 'A quantitative model for disruption mitigation in a supply chain', European Journal of Operational Research, vol. 257, pp. 881 - 895, http://dx.doi.org/10.1016/j.ejor.2016.08.035

Samavati M; Essam D; Nehring M; Sarker R, 2017, 'A local branching heuristic for the open pit mine production scheduling problem', European Journal of Operational Research, vol. 257, pp. 261 - 271, http://dx.doi.org/10.1016/j.ejor.2016.07.004

Rahman HF; Sarker R; Essam D, 2017, 'A genetic algorithm for permutation flowshop scheduling under practical make-to-order production system', Artificial Intelligence for Engineering Design, Analysis and Manufacturing: AIEDAM, vol. 31, pp. 87 - 103, http://dx.doi.org/10.1017/S0890060416000196

Paul SK; Sarker R; Essam D, 2016, 'Managing risk and disruption in production-inventory and supply chain systems: a review', Journal of Industrial and Management Optimization, vol. 12, pp. 1009 - 1029, http://dx.doi.org/10.3934/jimo.2016.12.1009

Hamza NM; Essam DL; Sarker RA, 2016, 'Constraint Consensus Mutation-Based Differential Evolution for Constrained Optimization', IEEE Transactions on Evolutionary Computation, vol. 20, pp. 447 - 459, http://dx.doi.org/10.1109/TEVC.2015.2477402

Chakrabortty RK; Sarker RA; Essam DL, 2016, 'Multi-mode resource constrained project scheduling under resource disruptions', Computers and Chemical Engineering, vol. 88, pp. 13 - 29, http://dx.doi.org/10.1016/j.compchemeng.2016.01.004

Hishamuddin H; Sarker R; Essam D, 2016, 'An inventory recovery model for an economic lot sizing problem with disruption', Jurnal Teknologi, vol. 78, pp. 143 - 148, http://dx.doi.org/10.11113/jt.v78.9162

Rahman HF; Sarker R; Essam D, 2015, 'A genetic algorithm for permutation flow shop scheduling under make to stock production system', Computers and Industrial Engineering, vol. 90, pp. 12 - 24, http://dx.doi.org/10.1016/j.cie.2015.08.006

Elsayed S; Sarker R; Essam D, 2015, 'Survey of Uses of Evolutionary Computation Algorithms and Swarm Intelligence for Network Intrusion Detection', International Journal of Computational Intelligence and Applications, vol. 14, http://dx.doi.org/10.1142/S146902681550025X

Rahman HF; Sarker R; Essam D, 2015, 'A real-time order acceptance and scheduling approach for permutation flow shop problems', European Journal of Operational Research, vol. 247, pp. 488 - 503, http://dx.doi.org/10.1016/j.ejor.2015.06.018

Chakrabortty RK; Hasin MAA; Sarker RA; Essam DL, 2015, 'A possibilistic environment based particle swarm optimization for aggregate production planning', Computers and Industrial Engineering, vol. 88, pp. 366 - 377, http://dx.doi.org/10.1016/j.cie.2015.07.021

Sarker R; Essam D; Hasan SMK; Karim ANM, 2015, 'Managing risk in production scheduling under uncertain disruption', Artificial Intelligence for Engineering Design, Analysis and Manufacturing: AIEDAM, vol. 30, pp. 289 - 299, http://dx.doi.org/10.1017/S0890060415000323

Paul SK; Sarker R; Essam D, 2015, 'A disruption recovery plan in a three-stage production-inventory system', Computers and Operations Research, vol. 57, pp. 60 - 72, http://dx.doi.org/10.1016/j.cor.2014.12.003

Showing 1 - 50 of 203 publications
1
2
3
4
5
Next